NEWS

  • Progress

    – The WP1 has been successfully completed on time. The first design aspects have been concluded, which can be then used as boundary conditions for the CFD simulations.
    – The WP2 has been successfully completed. The supercritical heat exchanger and scroll expander have been optimized and their design concluded.
    – The WP3 has been successfully completed. The two key components of the SCORC engine (open-drive scroll expander and evaporator) have been manufactured according to the designs of WP2.
    – The WP4 has been successfully completed. The whole SCORC engine has been manufactured and it is ready for the lab tests.
    – The WP5 has been successfully completed. The economic analysis and feasibility study for the benefit of the participating SMEs have been conducted. Moreover, the SCORC engine has been tested at the NTUA lab for hot water temperature of 65-100 oC.
    – The WP6 includes other activities, such as project dissemination, IP strategy, and planning of the production processes.